Categories | Purlin Roll Forming Machine |
---|---|
Brand Name: | DB |
Model Number: | YX-086 |
Certification: | ISO;BV;CE;SGS |
Place of Origin: | China |
MOQ: | 1 |
Price: | US $40,000 - 60,000 / Set |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 4 Set/Sets per Month |
Delivery Time: | 45 days |
Packaging Details: | Plastic Film package;40GP Container |
Power(W): | 15000 |
Dimension(L*W*H): | 11400 x 1600 x 1800mm |
Voltage: | 380V |
Control Syste: | PLC Panasonic |
Automatic C and Z Purlin Roll Forming Machine With
Switch Easily And Cost Savings
C-Z quick interchangeable machine adopts a special structure. The rollers for C & Z are changed very quickly without dismantle any parts. One machine can produce all specifications of C & Z purlins. Crimples are optional to increase rigidity of purlin.
Working flow
Uncoiler—Feeding—Leveling--hydraulic punching—Hydraulic cutting—Roll forming—output table
Character of main structure
a) The structure is simple and the appearance of the machine is beautiful because we adopt the shape-steel structure and most of the connecter is screw which make the machine flexible and stronger.
b) All the components of machine are from brand-famous enterprise so that they ensure the machine normal function very effectively.
c) We adopt the automatic length-fixed forming and cutting to guarantee the length to be precise and the finished product clear without deforming .
d) It is very easy to install the equipment and suitable for producing in the factory.
e) Low noise with high efficiency
f) The width of the profile can be automatic adjusted and the last 10 roller stations can be overturned to make C&Z purlin
Main Specification
Main dimension | 11400 x 1600 x 1800mm |
Total weight | 14000kg |
Main motor | 14kw |
Hydraulic motor | 11kw |
Hydraulic pressure | 15-20MPa |
Forming speed | 10-12 m/min |
Changing speed from one profile to another or from one size to another size | 15 minutes |
Purlin specifications | For C purlin: 100-300mm For Z purlin: 140-300mm |
Suitable material | 1.6-3.0mm, Q195~235 cold rolled steel, hot-zinc coil |
Material of rollers | GCr15, 9CrSi, quenched |
Material of rib roller | GCr15, 40Cr, quenched |
Shape of rib | slash rib |
Steps of rollers
Feeding & guiding | two sets |
Lveling | one set, seven rollers |
Main forming | 20 steps |
Rib making | one step |
Rectifying | one step |
Terms of payment: 30%T/T ,Balance to be paid before shipping after inspection
Deliver time: 50days after get 30% down payment
Warranty: 1 year warranty from date of shipment
Guarantee
(1)Engineer will give free training lessons to labors in buyer’s
factory.
(2)The Buyer will buy the round-trip air ticket for Engineer if
visa application is approved. The buyer is also responsible to bear
expenses generated, e.g. visa formalities, meals, accommodation and
allowance of USD50 for engineer.
(3)During this guarantee period, we will provide spare parts
without any charge in case of quality discrepancy caused by us. If
the malfunctions are caused by your incorrect operations, we will
provide the buyer spare parts at cost price.
(4)We will charge the buyer cost price of spare parts beyond one
year and provide long-term technical guide.
Product Picture Show
Certification